The Institute of Mathematics and Applications
Research institute
Instituto Tecnológico y de Estudios Superiores de Monterrey
Monterrey, MéxicoPublications in collaboration with researchers from Instituto Tecnológico y de Estudios Superiores de Monterrey (12)
2024
-
A sustainable inventory model for deteriorating items with power demand and full backlogging under a carbon emission tax
International Journal of Production Economics, Vol. 268
2021
-
Optimizing price, order quantity, and backordering level using a nonlinear holding cost and a power demand pattern
Computers & Operations Research, Vol. 133, pp. 105339
2019
-
A hybrid metaheuristic algorithm for a parallel machine scheduling problem with dependent setup times
Computers and Industrial Engineering, Vol. 131, pp. 295-305
-
A metaheuristic algorithm and simulation to study the effect of learning or tiredness on sequence-dependent setup times in a parallel machine scheduling problem
Expert Systems with Applications, Vol. 117, pp. 62-74
-
Optimal price and quantity under power demand pattern and non-linear holding cost
Computers and Industrial Engineering, Vol. 129, pp. 426-434
2016
-
A mixed integer formulation and an efficient metaheuristic procedure for the k-Travelling Repairmen Problem
Journal of the Operational Research Society, Vol. 67, Núm. 8, pp. 1121-1134
2014
-
A bi-objective vehicle routing problem with time windows: A real case in Tenerife
Applied Soft Computing Journal, Vol. 17, pp. 140-152
-
Biased random key genetic algorithm for the Tactical Berth Allocation Problem
Applied Soft Computing Journal, Vol. 22, pp. 60-76
2013
-
Effect of the initial solutions to balance routes in vehicle routing problem with time windows
Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
-
Hybrid estimation of distribution algorithm for the quay crane scheduling problem
Applied Soft Computing Journal, Vol. 13, Núm. 10, pp. 4063-4076
2011
-
Estimation of distribution algorithm for the quay crane scheduling problem
Studies in Computational Intelligence
2010
-
The integrality of the lot size in the basic EOQ and EPQ models: Applications to other production-inventory models
Applied Mathematics and Computation, Vol. 216, Núm. 5, pp. 1660-1672